detached house wimbledon timber frame

Detached House Wimbledon

This challenging large timber project, built in October 2022 was of a very high specification, featuring exposed glulam beams, open living spaces and high ceilings.

The client also specified a rock wool insulation between the studs on this project, focusing on airtightness at all the critical junctions.

We worked collaboratively with the architect, engineer and main contractor to deliver this impressive timber frame structure.

Size: 310m sq
Timber frame construction time: 5 weeks

Building a timber frame house?

We provide everything you need to build a sustainable timber frame house, working right alongside you every step of the way.