This development consists of eight detached houses, seven three-storey and one two-storey. Timber frame construction started on site in August 2024 and the entire project was completed in 10 weeks.
We used a factory-insulated panel for the construction, achieving an exceptional u-value of 0.17 W/m2K. We used 254mm metal web joists with 22mm chipboard flooring and the roof design incorporated loose rafters supported by a steel ridge beam.
Each plot boasts an area of 140m sq., each house taking approximately 5-7 days to complete.
Size: 140m sq per house
Timber frame Construction time: 5-7 days per house
Building a timber frame house?
We provide everything you need to build a sustainable timber frame farmhouse, working right alongside you every step of the way.
Contact us about your build project today.