Three Bed Detached House Sleaford

We supplied and installed the bespoke timber frame for this self-build project in October 2023.

The upstairs to this detached house is vaulted throughout, with a large, glazed opening at one end set back from the overhanging roof. It features a gym, library and three bedrooms.

Our factory-insulated external wall with VCL and service batten provides a 0.15 U-value.

Size: 230m sq
Timber frame construction time: 15 days

Building a timber frame house?

We’re here to assist you every step of the way!

Reach out to us today to discuss your self-build project.

Mixed Housing Phase 3 Harwich

Phase three of a 42-unit residential development in Essex for an existing client began in December 2023.

With only four house types and a proactive main contractor, this site is ideally suited to timber frame construction.

There was no wasted time between trades, with the roofers making the plots watertight within days of timber frame completion.

All panels are factory-insulated according to the latest building regulations.

Size: Ranging from 151-208m sq
Timber frame construction time: 1 week per plot

Building a sustainable development?

Contact us today to discuss how we can support your residential development project with sustainable timber frame construction.

Five Bedroom Detached House Essex

This detached house in Ongar, Essex, is a reasonably modest design from the outside. However, the specs and scale are far from modest with a gross floor area of 320 sq. m.

As our client is aiming for passive performance on this project, we designed, supplied, and installed our highest-performing factory-insulated panel. We boosted the thermal performance by fitting an additional layer of 70mm of insulation internally, providing an impressive u-value of 0.11 W/m2K.

We also designed the joists around the MVHR system and installed an airtight membrane at the floor junctions.

We look forward to re-visiting once complete to see the result of the all-important air test!

Size: 320m sq
Timber frame construction time: 20 days

Building a timber frame house?

Get in touch with us today to discuss your sustainable timber frame project. We’re here to help!

Detached House Cambridge

The vaulted ceiling makes this tiny detached house look much bigger than it actually is.

Squeezed between two existing plots in the heart of Cambridge access was very limited, but we successfully got our hi-ab lorry set up to install the timber frame.

Despite the small size, our client opted for a highly insulated panel, and we added 40mm of insulation internally to achieve a 0.12 u-value.

It was a joy to work on this project.

Size: 74m sq
Timber frame construction time: 6 days

Building a timber frame house?

We provide everything you need to build a sustainable timber frame house, working right alongside you every step of the way.

Contact us about your self-build project today.

Three Bedroom Chalet Bungalow

In September 2023, we installed this small yet spacious chalet-style bungalow in Kirkby-Le-Stoke, Essex.

The open plan layout downstairs maximises the perception of space, making it appear much larger than the actual footprint.

It features one bedroom downstairs and two bedrooms in the roof space, which were created by using attic trusses.

The attached garage provides some valuable storage space.

Size: 158m sq
Timber frame construction time: 8 days

Building a timber frame house?

Looking to create more space? Get in touch with us today to discuss your timber frame project.

Build It Live 2024: Feb 24-25

The UK Structures team will be at Build It Live Southeast 2023 on 24 & 25 February.

If you’re planning a self-build or extending a property, and you’re interested in sustainable timber frame construction, come and see us at the Kent Event Centre, part of Kent Country Showground, Maidstone.

The exhibition is open Saturday between 10am and 5pm and Sunday between 10am and 4.30pm, and the team will be on hand to answer all your timber frame questions and offer free, impartial advice.

We look forward to seeing you there!

Claim your FREE tickets!

Customers of UK Structures can take advantage of our a special offer ticket, which admits 2 visitors to Build It Live at no cost, saving the ticket holder £24!

To claim your free ticket, click on ›› https://builditlive.co.uk/planning24/

Homebuilding & Renovating Show: Sep 22-24

The UK Structures team will be at the London Homebuilding & Renovating Show in 2023, from 22-24 September.

If you’re planning a self-build or extending a property, and you’re interested in sustainable timber frame construction, come and see us at London’s ExCel. From practical tips to inspiring advice and the latest products, it’s all under one roof at the London Homebuilding & Renovating Show.

The exhibition is open from Friday between 10am and 5pm through to Sunday between 10am and 5pm, and the team will be on hand to answer all your timber frame questions and offer free, impartial advice.

We look forward to seeing you there!

Register for your FREE tickets!

Customers of UK Structures can take advantage by registering for a pair of free entry tickets, to admit 2 people to one day at the show.

To claim your free tickets, click on the banner below and register for your free entry:

detached house wimbledon timber frame

Detached House Wimbledon

This challenging large timber project, built in October 2022 was of a very high specification, featuring exposed glulam beams, open living spaces and high ceilings.

The client also specified a rock wool insulation between the studs on this project, focusing on airtightness at all the critical junctions.

We worked collaboratively with the architect, engineer and main contractor to deliver this impressive timber frame structure.

Size: 310m sq
Timber frame construction time: 5 weeks

Building a timber frame house?

We provide everything you need to build a sustainable timber frame house, working right alongside you every step of the way.

Contact us about your build project today.

Homebuilding & Renovating Show: Jul 1-2

The UK Structures team will be at the Homebuilding & Renovating Show 2023, on 1-2 July.

If you’re planning a self-build or extending a property, and you’re interested in sustainable timber frame construction, come and see us at Sandown Park in Surrey. From practical tips to inspiring advice and the latest products, it’s all under one roof at the Homebuilding & Renovating Show.

The exhibition is open Saturday between 10am and 5pm and Sunday between 10am and 4.30pm, and the team will be on hand to answer all your timber frame questions and offer free, impartial advice.

We look forward to seeing you there!

Register for your FREE tickets!

Customers of UK Structures can take advantage by registering for a pair of free entry tickets, to admit 2 people to one day at the show.

To claim your free tickets, click on the banner below and register for your free entry: