UK Structures built the timber frames for this pair of semi-detached three-bedroom houses in July 2022 for a main contractor.
Both pairs are identical in design, which helped speed up the design process, and it took just three weeks to install the structural timber frame. As a result, we were able to save the contractor time and provide a cost-effective construction method.
Size: 470m sq
Timber frame construction time: 3 weeks