We constructed the timber frames for these two bungalows for an existing client in August 2022.
They are part of a larger development of bungalows and are well-proportioned to provide three bedrooms, a bathroom, an en-suite, a kitchen and a utility room.
With an install time of just one week each, the bungalows lend themselves very well to timber frame construction. The repeat designs make them cost-effective and quick to hand over to follow on trades.
Size: 110m2
Timber frame construction time: 1 week each
Building a timber frame house?
We provide everything you need to build a sustainable timber frame home, working right alongside you every step of the way.
Contact us about your build project today.